Project Challenge / Design Obstacle:

  • Customer needed a 1-in-3-hour fire-rated firewall.
  • Minimal disruption to ongoing operations was critical.


Thermo-Guard Solution:

  • Applied spray-applied cementitious fireproofing (Monokote MK-6 HY) directly to the existing metal structure.
  • Completed the entire scope in just 2 days, allowing production to continue uninterrupted.


Results:

  • Fire Marshal inspection passed the very next day—production resumed immediately.
  • Avoided extended downtime, major reconstruction, and loss of usable space.
  • Faster, more efficient, and roughly half the cost of traditional firewall construction.


Technical Note:

  • Cementitious fireproofing creates a physical 3-hour fire-rated barrier, ideal for industrial metal buildings.
  • Alternative: Intumescent coatings expand under heat, offering space-saving, thin fire protection—best for aesthetics or limited-clearance areas.


Quick Takeaway:

  • Fireproofing can be fast, cost-effective, and minimally disruptive when the right system and product are selected.